Newly Commissioned Installations
Lee County, Florida
Corkscrew Water Treatment Plant
Lee County Board of County Commissioners
Leopold® FilterWorx™ rapid gravity granular media filtration system including Leopold® Type S® underdrain, Leopold® IMS® (Integral Media Support) cap, air header piping, stainless steel (diamond) wash troughs, and Leopold® Engineered Filter Media® products (sand and anthracite) for eight (8) filters.
Total area: 2,024 ft2.
West Palm Beach, Florida
Reclaimed Water Facility at ECRWRF (East Central Regional Water Reclamation Facility) and FP&L (Florida Power & Light)
Palm Beach County Water Utilities Department
Leopold® FilterWorx™ tertiary granular media filtration system including Leopold® Type S® underdrain, air header piping, Leopold® Engineered Filter Media® products (sand and gravel) and Leopold® FilterWorx® automatic control system for six (6) filters. Total area: 4,212 ft2.
Waco, Texas
Mt. Carmel Water Treatment Plant
City of Waco Water Utilities Services
Leopold® Clari-DAF® (Dissolved Air Flotation) system designed to handle flows of 90 MGD (3.95 m3/sec) at a loading rate of 17 gpm/ft2 (42.5 m/hr) based on collector area.
Note: The design loading rate of this system is the highest of any Leopold® Clari-DAF® system in operation.